PROJECT EXPERIENCE

Widening of the Homestead Extension of Florida’s Turnpike (HEFT) from SR 836 to NW 106th Street; FPID 435543-1-52-0; Miami-Dade County, FL

Client: Florida’s Turnpike Enterprise (FTE)
Length: 8 miles
Duration: 1/21 – Present
Client: Florida’s Turnpike Enterprise (FTE)
Length: 8 miles
Duration: 1/21 – Present

Widening of HEFT from 6/8 lanes to 10 lanes with Express Lanes, from milepost 26 to milepost 34. Improvements also included widening and reconstruction of the HEFT interchanges at NW 12th St, NW 41st St, NW 74th St, and NW 106th St.  HEFT mainline or C-D road bridges widened over SR 836/NW 12th St, NW 25th St, NW 41st St, NW 58th St and NW 74th St Canal. Ramp bridges were also widened at NW 41st St and NW 74th St. Interchange improvements at SR 836 include the construction of three new ramps including direct connection ramp flyovers (Category II Bridges) from eastbound and westbound SR 836 to northbound HEFT Express Lanes, and from the southbound HEFT Express Lanes to eastbound and westbound SR 836.  In addition, three new ramp bridges will be constructed at the SR 836 and NW 12th Street Interchanges.  NW 117th Ave will be converted from a two-lane two-way frontage road between NW 34th St and NW 41st St, and from NW 41st St to NW 50th St, to a single lane northbound only roadway, and new NW 117th Ave single lane bridge will be constructed over NW 41st St with ramp access to northbound HEFT and a slip ramp connecting northbound only NW 117th Ave local traffic across NW 41st St. Other improvements include subsoil excavation of unsuitable materials, signing and marking, drainage and stormwater management improvements, highway lighting, and upgraded ITS infrastructure. Several toll facilities are being added or replaced including the construction of 4 new All Electronic Tolling (AET) express lane facilities, 4 replacement ramp AET facilities, and new AET mainline facility with accessible toll gantries for both express and general-purpose toll lanes located north of NW 74th Street.  This project also includes Wrong Way Counter Measures (solar powered with cellular transmission) at 4 locations utilizing Blink Link software to communicate to the TMC.

I-75/Palmetto Express Lanes Project (Palmetto Express), (432687-1-52-01); Miami-Dade County, FL

Client: FDOT District 6
Construction cost: $272 Million
Length: 13 miles
Project involvement: 7/20-12/20
Client: FDOT District 6
Construction cost: $272 Million
Length: 13 miles
Project involvement: 7/20-12/20

This 4-year Design-Build project is part of FDOT’s South Florida’s Express Lanes network, which will ultimately provide Express Lanes continuity between SR-826/Palmetto Expressway, I-75, Florida’s Turnpike, I-95 and Sawgrass Expressway.  Located in Miami-Dade County, this project extends approximately 13 miles along the SR-826/Palmetto Expressway from West Flagler Street to NW 154 Street, and approximately 3 miles along I-75 from the SR-826/Palmetto Expressway to NW 170 Street.  This project consists of roadway ITS installation for tolling, ramp signalization and traffic monitoring systems, Turnpike Infrastructure installation (5 toll gantries and hub buildings), numerous cantilever and truss sign structures, traffic control devices for express lanes, drainage, asphalt resurfacing and overbuild, earthwork, roadway widening, bridge widening (concrete and steel structures), and new flyover bridge construction.  Responsibilities not only included overseeing the operations, but also coordinating with numerous agencies, municipalities, and numerous stakeholders.

I-95 Express Lanes Phase 3A-2 From North of Commercial Boulevard to South of SW 10th Street; Broward County, FL

Client: FDOT District 4
Contract amount: $144,967,306.42
Project involvement: 2017-2019
Client: FDOT District 4
Contract amount: $144,967,306.42
Project involvement: 2017-2019

Includes ITS/Tolling components include the design, furnishing, installation and provision of: ITS poles and cabinets, Freeway DMS, Toll Amount DMS (T-DMS) and Lane Status DMS (S-DMS), Microwave Vehicle Detector Sensors (MVDS), CCTV cameras, Ramp Signaling Subsystems, Underground power distribution systems and generator backup systems, and all other related infrastructure.

I-95 Express Lanes and Ramp Signals – Phase 3B-1 From South of SW 10th Street to South of Glades Road; Broward and Palm Beach Counties, FL

Client: FDOT District 4
Contract amount: $102 Million
Project involvement: 2018-2018
Client: FDOT District 4
Contract amount: $102 Million
Project involvement: 2018-2018

Includes ITS/Tolling components include the design, furnishing, installation and provision of: ITS poles and cabinets, Freeway DMS, T-DMS and S-DMS, MVDS, CCTV cameras, Ramp Signaling Subsystems, Underground power distribution systems and generator backup systems, and all other related infrastructure.

HEFT (SR821) Widening from I-75 to South of Miramar Parkway (Contract No. E4R96); Broward County, FL;

Client: FDOT District 4
Contract amount: $143 Million
Project involvement: 2017-2018
Client: FDOT District 4
Contract amount: $143 Million
Project involvement: 2017-2018

Project consisted of Bridges, Heavy & Highway, Projects HEFT (SR821) Widening from I-75 to South of Miramar Parkway. Includes ITS/Tolling components include the design, furnishing, installation and provision of: ITS poles and cabinets, Freeway DMS, T-DMS and S-DMS, MVDS, CCTV cameras, Ramp Signaling Subsystems, Underground power distribution systems and generator backup systems, and all other related infrastructure.

SR 90/US 41/SW 8 Street Adaptive Signal Control Technology (ASCT) Pilot Project, Miami-Dade County, FL

Client: FDOT District 6
Contract amount: 3.6 Million
Project involvement: 2015-2016
Client: FDOT District 6
Contract amount: 3.6 Million
Project involvement: 2015-2016

Installation of the following components: FDOT Approved Products List (APL) approved InSync ASCT system which includes a Processor, Equipment Panel, DIN Relay, C1-Y cable, video detection system, power and communications cables, Ethernet repeaters and Power over Ethernet (PoE) injectors (if needed), pedestrian module, ASCT system software, and miscellaneous hardware required for a fully functional and operational system. Also included Inductive loops, lead-in cables, and ancillary hardware including loop amplifier modules at locations where strain poles are used, underground conduits, pull boxes, surge suppression, grounding and lightning protection.

Replacement of Various ITS Devices and Installation of Warning Gates Systems; Miami-Dade County, FL

Client: FDOT District 6
Contract amount: $6,422,016.00
Project involvement: 2016-2017
Client: FDOT District 6
Contract amount: $6,422,016.00
Project involvement: 2016-2017

Project consists of: Replacement of toll amount and lane status dynamic message signs (DMS) on 95 Express (north of Golden Glades Interchange (GGI) to Miami-Dade County /Broward County limits), corresponding sign structures work and static sign panel work. Replacement of DMS CCTVs, MVDS, FOC backbone, communications equipment, conduit and cab ling for all ITS devices.  Installation of gates and signs along entrance ramps onto 95 Express

FDOT District 4 ITS Grouping (Broward and Palm Beach Counties) including: ATMS for SR-817, SR-818, SR-7; ADMS and Data Collection Sites along SR-80/Southern Blvd from Royal Palm Beach Boulevard to Dixie Highway; ATCS on Northlake Boulevard from Military Trail to Federal Highway; ADMS on Blue Heron Boulevard and 45th Street; and ATCS on Okeechobee Boulevard from Tamarind Avenue to Flagler Drive

Client: FDOT District 4
Contract amount: $7,982,486.00
Project involvement: 2013-2015
Client: FDOT District 4
Contract amount: $7,982,486.00
Project involvement: 2013-2015

Included deployment of ATMS field devices including, CCTV system, ADMS, Arterial Travel Time System (ATTS), MVDS, FOC network along the corridors. Also includes the integration of the ATMS field devices into the Regional Traffic Management Center for District 4, as well as the furnishing, installing, integrating, and testing of the following elements: 22 CCTV, 9 ADMS, 2 MVDS sites, 76 ATTS, the integration of 53 PTMS and a FOC network.

I-75 Express Lanes - Segment E from North of Griffin Road to; Broward County, FL

Client: FDOT District 4
Contract amount: 75 Million
Project involvement: 2013-2015
Client: FDOT District 4
Contract amount: 75 Million
Project involvement: 2013-2015

The proposed new ITS components for District Four Operation and Maintenance include the design, procurement, installation and testing of the following components within the I-75 and I-595 ROW. ITS poles and cabinets, Freeway DMS, T-DMS, S-DMS, MVDS, CCTV, underground power distribution, and generator backup system